PENGARUH MATERIAL RETURN TO WAREHOUSE, LEAD TIME, DAN FORECAST ACCURACY TERHADAP EFISIENSI PENGELOLAAN SPAREPARTS PADA PERUSAHAAN MANUFAKTUR

Authors

  • Muhammad Ludhiansyah Putra Universitas Krisnadwipayana

DOI:

https://doi.org/10.47353/bj.v6i1.148

Keywords:

Material Return to Warehouse, Lead Time, Forecast Accuracy, Spareparts, Inventory Management

Abstract

Effective spare parts management plays an important role in supporting the operational activities of manufacturing companies. This study aims to analyze the effect of Material Return to Warehouse (MRW), Lead Time, and Forecast Accuracy on spare parts management efficiency. This research used a quantitative approach with multiple linear regression analysis. Data were collected through questionnaires distributed to respondents involved in spare parts management in manufacturing companies. The results show that Material Return to Warehouse, Lead Time, and Forecast Accuracy partially and simultaneously have a significant effect on spare parts management efficiency. Effective MRW management can improve inventory accuracy and optimize the utilization of available materials. In addition, proper lead time management and accurate forecasting systems also play an important role in improving spare parts inventory efficiency. The results of this study are expected to contribute to improving the effectiveness of inventory management systems and supporting the operational activities of manufacturing companies.

Downloads

Download data is not yet available.

References

Arifin, Z., & Putri, N. (2022). Analisis pengelolaan spareparts pada sistem pergudangan perusahaan manufaktur. Jurnal Logistik Indonesia, 8(1), 12-20.

Babai, M. Z. (2014). Intermittent demand forecasting: An empirical study on accuracy and the risk of obsolescence. International Journal of Production Economics, 157(6), 212-219.

Christopher, M. (2016). Logistics and supply chain management (Vol. 5). Pearson.

Heizer, J. R. (2020). Operations management: Sustainability and supply chain management (Vol. 13). Pearson.

Kurniawan, B. &. (2023). Pengaruh lead time terhadap kinerja sistem persediaan pada industri manufaktur. Jurnal Teknik Industri, 24(2), 101-110.

Nahmias, S. &. (n.d.). Production and operations analysis (Vol. 7). 2015: Waveland Press.

Pratama, B. A. (2025). Pengelolaan persediaan sparepart dalam meningkatkan efisiensi operasional pada perusahaan manufaktur. Jurnal Teknologi dan Manajemen Industri Terapan, 4(1), 45-53.

Rahman, A. &. (2024). Analisis pengendalian persediaan sparepart menggunakan metode Economic Order Quantity (EOQ) pada industri manufaktur. Jurnal Teknik Industri, 25(2), 120-129.

Rogers, D. S.-L. (1999). Going backwards: Reverse logistics trends and practices.

Silver, E. A. (2017). Inventory and production management in supply chains (Vol. 4). CRC Press.

Slack, N. B.-J. (2019). Operations management. Pearson.

Downloads

Published

2026-03-12

How to Cite

Muhammad Ludhiansyah Putra. (2026). PENGARUH MATERIAL RETURN TO WAREHOUSE, LEAD TIME, DAN FORECAST ACCURACY TERHADAP EFISIENSI PENGELOLAAN SPAREPARTS PADA PERUSAHAAN MANUFAKTUR. Berajah Journal, 6(1), 82–91. https://doi.org/10.47353/bj.v6i1.148

Issue

Section

Article